Ground floor tiling

Work has begun on 18th Feb. Today is 22nd. Yet the floor is only half done. Very frustrating because the kitchen cabinet that I signed up for only gave me 3 months to have it completed. I asked the contractor before if he could finish the floor by 31st Jan and he said yes. It is now 22 Feb. Should be angry with him but somehow can't.

Everything is on hold because of this. I can't ask the designer to design the cabinets because the floor is not ready. I can't order backsplash tiles because I don't know how big is the space. I can't order porch tiles because have to confirm backsplash first. I can't ask the aluminium door guys to come for measurement as the floor is not done. 